The implementation involved the production of the steel structure of a production hall. A gable roof based on an I-beam structure with a tie rod. Wall and roof cladding was made using sandwich panels. The project and implementation included four sliding gates to maintain the communication flow. The structure was placed on steel columns, and the entire structure was protected against corrosion with an appropriate protective coating system.
In Sieniawa, a steel production hall with an area of over 2200 m² was completed. The facility was designed with functionality and durability in mind. Perfectly adapted to the existing buildings. Thanks to modern material and technological solutions, the hall meets the requirements of year-round use.
We would like to sincerely thank the Investor for the opportunity to collect the material and for the trust shown in choosing our company as the repeated contractor for this investment.
Potrzebujesz pomocy?
Skontaktuj się z naszym doświadczonym doradcą

MAKE AN APPOINTMENT FOR AN INTERVIEW
We will help you choose the best solution for your business